todos.json was last written 8/2 11:40 PM ET —
7.7 hours ago. Last Monday it had been frozen 8 days and every number on that brief was fiction.
nightly-helper-stale-date-fix-2026-07-28 shipped on 7/28 (the nightly helper was silently
reverting meta to 2026-05-01) and the backfill re-populated the missing weeks.Tickets marked completed with a completed_at date inside the window, grouped by project codename. Sprint 5 is a 2-week sprint, so this is the first half of the sprint we are still inside — not a closed sprint.
| Project | Closed | Tickets |
|---|---|---|
| untagged | 5 | 2026-07-28 · P2 claude · SIP + live-scan tooltips use line feeds (and a standing rule for every page) 2026-07-28 · P2 james · HUD scorecard-chart: mount-generation guard + ET day bucketing 2026-07-28 · P2 claude · VWAP Band Research System page 2026-07-28 · P2 claude · LYNCH Forward-Test Archive published 2026-07-28 · P1 claude · Nightly todos helper rewritten payload-driven (was silently reverting meta to 2026-05-01) |
| alerts-hotkeys-etc | 2 | 2026-07-27 · P3 claude · Backside Short radar + trigger listener pass 2026-07-27 · P3 claude · J3P Swing Radar surface published |
| scorecards | 1 | 2026-07-27 · P3 claude · v3 live runner wired headless + folded into run_all_eod |
| param_surface | 1 | 2026-07-27 · P3 claude · Param Surface + monthly reports fully regenerated |
| strategy_library | 1 | 2026-07-27 · P3 claude · LYNCH archive page published |
| playbooks | 1 | 2026-07-27 · P3 claude · June 2026 playbook data + best-of set rebuilt |
| accountability_hud | 1 | 2026-07-27 · P3 claude · Accountability v2: scorecard click-through + chart wiring (landed in PROD) |
| strategy-library | 1 | 2026-07-29 · P1 James · Pine session — Alpha Compression Break + Fashionably Late v2 suite advanced |
| system-hub | 1 | 2026-07-31 · P1 James · Sentiment-accuracy scoring pages published (SENTIMENT_ACCURACY + MTF_SENTIMENT_ACCURACY) |
| j3p | 1 | 2026-07-31 · P2 James · J3P surfaces published — Swing Radar, Cup Verify, Watcher |
| accountability | 1 | 2026-07-31 · P1 James · EOD catch-up backfilled 18 trader-days clean (ok=18 fail=0) |
Two kinds of slippage: (a) Sprint 5's own committed scope, none of which has started with 5 working days left; (b) tickets tagged to Sprints 1, 3 and 4 that are still open.
| Project | Committed item | Status now | Owner | Age |
|---|---|---|---|---|
| Exec | Enable Gr8Trade auto-execution in prod with conservative caps (1 share, 1 order/day, 3-symbol whitelist) | blocked P2 | claude | 38d |
| Exec | Daily review of every executed order — calibrate caps weekly | NO TICKET EXISTS | unassigned | — |
| StratLib | Alex Range Break walk-forward backtest at /backtests/range-break/ | pending P1 | alex | 89d |
| StratLib | Register Range Break in /strategies/ Library + canonical catalog | pending P1 | alex | 89d |
| MultiTrader | First Trader-of-the-Week session with Nolan | pending P1 | user | 89d |
| MTFVP | Roberto: TradingView ticket-in handler (Path B) | pending P1 | claude | 89d |
pending in week 1. One is blocked, one has no ticket at all, and the four that are merely pending are 44–89 days old — they were pending before Sprint 5 started. With 5 working days left, finishing all six is not on the table. Planning today is a re-scope, not a kickoff.| Sprint | Ticket | Owner | Status | Age |
|---|---|---|---|---|
| S1 | P0 Atlas 1/6 Data-freshness dashboard: /system/freshness.json + banner on hub | claude | pending | 108d |
| S1 | P0 Acct-v2 BUG: Risk Bump Progress bar does not respect the selected date range (always shows 5-day rolling, even when range = full month) | jimbo | pending | 88d |
| S1 | P0 Acct-v2 BUG: Ticket Meter denominator doesn't scale with date range (shows 1901 / 30 on 13-day MTD range) | jimbo | pending | 82d |
| S1 | P0 AMS AMS: seed main.users with trader rows so identity_fn returns non-zero | user | pending | 44d |
| S1 | P0 AMS AMS: create main.remembered_devices table (migration 002) — Phase 1 hard dependency | claude | pending | 44d |
| S1 | P0 AMS AMS: resolve 7 open decisions D1-D7 (canonical domain · auth stack · DB strategy · sharing · risk_hud · 2FA · daily-stop) | user | pending | 44d |
| S1 | P1 AMS AMS: write PHASE-3-STATUS.md mirroring PHASE-0-STATUS.md (Phase 3a baseline shipped, what's left) | claude | pending | 44d |
| S1 | P1 Backup Backup: mirror scheduled-task SKILL files from domino-1 to jimdo via scp | claude | pending | 44d |
| S3 | P1 PinePB J3P — live smoke test: TV alert -> webhook -> indicator_alerts row (1 SIP name) | claude | pending | 38d |
| S3 | P2 PinePB J3P — FashLate-style label/alert polish (compact toggle + per-play templates) | claude | pending | 38d |
| S3 | P2 PinePB J3P v2.3 — rebuild Trend play as Dale VWAP 1st-deviation pullback (retire 9-EMA trigger) | claude | pending | 38d |
| S3 | P1 SIP Deploy J3P across SIP master_watchlist (TV layout + webhook alert per symbol) | claude | pending | 38d |
| S3 | P2 SIP Auto-sync /sip/watchlist.json -> TradingView symbol list for J3P coverage rotation | claude | pending | 38d |
| S4 | P1 Exec Backtest J3P plays (Focus-3/KITE) on SIP names — edge by playbook x grade x tier before hotkeys | claude | in progress | 38d |
| S4 | P1 Exec Wire setups.today.json -> hotkey-engine for J3P-graded entries (SIM -> forward-test) | claude | pending | 38d |
active_sprint_id is 1 (“Foundation hardening + AMS unblock”, 2026-06-22 → 2026-06-26) — the sprint that was
supposed to end 6/26. This was the #1 recommendation of last Monday's brief and it did not happen.
The ledger half of that recommendation did get fixed; the sprint-bookkeeping half did not.
Every sprint-scoped number on this page still has to be reconstructed from the plan page rather than
read off the board. It is a 2-minute edit. Do it in the room.
The six items sprint-plan.html commits to Sprint 5, matched to live tracker tickets. Estimated days are Atlas estimates — the tracker has no estimate field, so these size the conversation, they are not a commitment.
| Project | Item | Status | Owner | Est. | Ticket |
|---|---|---|---|---|---|
| Exec | Enable Gr8Trade auto-execution in prod with conservative caps (1 share, 1 order/day, 3-symbol whitelist) | blocked P2 | claude | 5d | exec-kore-live-j3p |
| Exec | Daily review of every executed order — calibrate caps weekly | NO TICKET | unassigned | 2d | — |
| StratLib | Alex Range Break walk-forward backtest at /backtests/range-break/ | pending P1 | alex | 3d | alex-range-break-backtest |
| StratLib | Register Range Break in /strategies/ Library + canonical catalog | pending P1 | alex | 1d | alex-range-break-register |
| MultiTrader | First Trader-of-the-Week session with Nolan | pending P1 | user | 1d | phase-4-trader-of-the-week |
| MTFVP | Roberto: TradingView ticket-in handler (Path B) | pending P1 | claude | 4d | mtf-vp-tradingview-handler |
| Total committed | 16d |
No ticket in the tracker has a depends_on field (0 of 496 — unchanged from last week). Everything below is inferred from ticket notes, the critical path, and the plan page. Adding real depends_on data is itself a candidate ticket — it is the reason this section is hand-reasoned every Monday.
| Sprint 5 item | Blocked by (inferred) |
|---|---|
| Exec Enable Gr8Trade auto-execution in prod with conservative caps (1 share, 1 order/day, 3-symbol whitelist) | Trigger Engine (not started) → Risk Gate (no ticket) → Gr8Trade adapter (pending, 44d) → firm-confirm on Gr8Script/Kore call signatures. Ticket itself is status=blocked. |
| Exec Daily review of every executed order — calibrate caps weekly | Nothing executes until the item above ships. Cannot start. |
| StratLib Alex Range Break walk-forward backtest at /backtests/range-break/ | alex-range-break-rules (Sprint 4 carry-over, pending 89d) must be codified first. |
| StratLib Register Range Break in /strategies/ Library + canonical catalog | The backtest above must pass first. Two links back in the same chain. |
| MultiTrader First Trader-of-the-Week session with Nolan | Plan says deferred until classifier reliable. Classifier refresh cron still has no ticket and no owner. |
| MTFVP Roberto: TradingView ticket-in handler (Path B) | None technically. But the plan says Roberto and the ticket says owner=claude — nobody has actually picked it up in 89 days. |
classify/*.json live → Trigger Engine can poll it → Alert Channels fan out →
Risk Gate checks the alert → Gr8Trade adapter turns it into an order → caps + daily review.
Sprint 5's headline goal is the last link. The first three links have not
moved in 103 days, and there are 5 working days left.Top 7 from sprint-plan.html, re-sorted so everything that can start today with nothing in its way is on top.
Tickets marked completed, Monday → Friday, last 4 weeks. Read this as throughput, not sprint progress — almost none of it was committed scope.
| Week (Mon–Fri) | Closed | |
|---|---|---|
| 7/6 → 7/10 | 7 | |
| 7/13 → 7/17 | 11 | |
| 7/20 → 7/24 | 9 | |
| 7/27 → 7/31 | 16 |
| Owner | Project | Ticket | Age |
|---|---|---|---|
| user | Atlas | 6/6 indicator_alerts DDL audit: dump schema, commit as ground truth | 108d |
| user | MultiTrader | USER: 3 steps to finish journal persistence | 107d |
| user | MultiTrader | USER: run scientific_layer migrations 001–009 via psql tunnel | 103d |
| jimbo | Acct-v2 | BUG: Risk Bump Progress bar does not respect the selected date range (always shows 5-day rolling, even when range = full month) | 88d |
| james | Atlas | Compliance follow-up: delete (or hide) historical MGP pages 4/17 through 5/12 — they still contain Vital Knowledge text | 82d |
| jimbo | Acct-v2 | BUG: Ticket Meter denominator doesn't scale with date range (shows 1901 / 30 on 13-day MTD range) | 82d |
| James | Atlas | BUG: MGP auto-fire skipped 5/14 mid-day + recap; 5/15 morning ran ~2h45m late | 80d |
| james | Atlas | Nightly PM daemon went dark 5/20-5/22 (3 consecutive missed fires) — fix wake/launch | 72d |
| user | AMS | AMS: seed main.users with trader rows so identity_fn returns non-zero | 44d |
| user | AMS | AMS: resolve 7 open decisions D1-D7 (canonical domain · auth stack · DB strategy · sharing · risk_hud · 2FA · daily-stop) | 44d |
| user | PinePB | TradingView setup guide for James — paste Pine script, configure alerts, test | 43d |
| user | PinePB | James pastes finalized Pine script into TradingView + configures the 3 alerts | 43d |
| Project | Ticket | Owner | Age |
|---|---|---|---|
| P0 Classifier | Liberator minute_bars entitlement LOST (27->10 datasets) — Stage B mechanism backfill now BLOCKED on data | claude | 57d |
| P2 Exec | Automate J3P execution via Kore backend (firm-confirm Gr8Script -> forward -> live) | claude | 38d |
| P0 untagged | DECISION: SIP top-10 is always catalyst-sweep names — pick a rebalance option | james | 6d |
| P0 untagged | DECISION: demote revbreak_long from the validated set (confidently negative live) | james | 6d |
app-status.json: that file is itself 25 days old, so the freshness monitor still cannot report on freshness.| Property | Newest file | Age | Threshold | |
|---|---|---|---|---|
| MGP (Morning Game Plan) | 2026-08-03 06:49 ET | 0.6h | 24h | OK |
| SIP (Stocks in Play) | 2026-08-03 07:22 ET | 0.0h | 24h | OK |
| Scorecards | 2026-08-02 16:56 ET | 14.4h | 30h | OK |
| Multi-TF Stack | 2026-08-03 07:22 ET | 0.0h | 24h | OK |
| Playbooks | 2026-07-06 21:16 ET | 658.1h | 30h | STALE |
| Strategy Library | 2026-06-17 18:35 ET | 1116.8h | 720h | STALE |
| PM ledger (todos.json) | 2026-08-03 01:21 ET | 6.0h | 48h | OK |
| Freshness monitor (app-status.json) | 2026-07-08 12:01 ET | 619.4h | 48h | STALE |
p0-freshness-dashboard, critical-path step 3, READY, 108 days old.Answer these before committing to anything. Each one is a real fork in the road.
active_sprint_id is still 1. This was last Monday's #1 recommendation. Who owns closing Sprints 1–4 today, in the room?The ledger half of that recommendation shipped (7/28) and the results are visible all over this page. The bookkeeping half is a 2-minute edit that has now survived six sprint briefs. Proposed: close Sprints 1–4, move the 15 survivors to backlog, set active_sprint_id=5, and stop reconstructing sprint state from a June HTML page.run-scientific-layer-migrations is 103 days old and is step 1 of the critical path. It needs a psql tunnel and a quarter of an hour. This is its fifth sprint. If there is genuinely no window, the honest move is to hand the credentials to Atlas rather than carry it a sixth time.blocked on James for 6 days — SIP rebalance and the revbreak_long demotion. Can we close both in this meeting?Neither is work; both are a yes/no. sip-scoring-rebalance-decision and revbreak-long-demotion-decision each gate downstream tickets, and 6 days is already long for a decision that fits in a sentence. Cheapest two items on the whole board — take them first, before the re-scope conversation.| # | Commit | Owner | Time | Why this one |
|---|---|---|---|---|
| 1 | Answer the 2 blocked P0 decisions (SIP rebalance, revbreak_long demotion) | james | 10 min | In the room, today. They are sentences, not projects, and they gate downstream work. |
| 2 | Close Sprints 1–4, move survivors to backlog, set active_sprint_id=5 |
claude | 2 min | Sixth brief carrying this. Until it lands, no sprint number on any page is real. |
| 3 | James runs scientific_layer migrations 001–009 | user | 15 min | 103 days old. Retires 4 P0s and unblocks the entire classifier → Exec chain. |
| 4 | Atlas ships p0-freshness-dashboard MVP (property side) | claude | 2h | 3 properties are stale right now and nothing is watching. Closes the Phase 0 freeze. |
| 5 | The one real sprint item: Exec Trigger Engine MVP + Alert Channels in DEV | claude | rest of week | Alerts to humans only. Live Gr8Trade orders are Sprint 6 at the earliest — that chain cannot compress into 5 days. |