End-of-Day Brief · ATLAS

Monday, June 22, 2026 · generated 6:01 PM ET by Atlas
✓ Trading day closed · retrospective for tomorrow's 8:30 AM ET standup
0
shipped today
4
in flight
1
new blockers today
33
open P0
0/8
Sprint 1 done

Shipped today completed_at = 2026-06-22 ET, grouped by project

No tickets were marked completed_at = 2026-06-22 today. Day 1 of Sprint 1 was spent in flight (see below), not closing tickets — the sprint backlog is still 0/8. First close needs to land tomorrow to stay on the 6/26 burn-down.

In flight today status = in_progress · note-edit time = unknown (no git history on todos.json)

Also opened today (pending): MTFVP Grade tooltips — show calculation details across all surfaces

New blockers raised today created_at = 2026-06-22 · P0/P1

AgeProjectOwnerPriTitle
0dMTFVPclaudeP1Change-of-Character panel — timestamp + duration + severity-trend per row

What's open for tomorrow ranked for the 8:30 AM ET standup · aligned to Sprint 1 goal

1
Run scientific_layer migrations 001–009 via psql tunnel
Critical-path unblock — owner: user · P0 · 61d blocked. Retires the daily_summary view, the rule-based classifier path, and identity_fn DB writes. Unchanged from this morning: still the single highest-leverage step, and nothing downstream moves until it lands.
2
Seed AMS users + resolve the 7 open decisions (D1–D7)
Sprint 1 goal #2: “Seed AMS users so onboarding stops being painful.” Both are owner: user, P0, in the active sprint. Seeding main.users is what makes identity_fn return non-zero; D1–D7 unblocks the rest of the AMS Phase-1 build.
3
Fix the two Acct-v2 date-range bugs (Risk Bump bar + Ticket Meter denominator)
Sprint 1 goal #3: “Fix Acct-v2 date-range bugs.” Both owner: jimbo, P0, in the active sprint, and both visibly wrong on every non-5-day range. HUD is off-limits to Claude — these need Jimbo at standup.

Critical path · next unblockable step from /system/sprint-plan.html

1
USER: run scientific_layer migrations 001–009 via psql tunnel P0
61d blocked · owner: user. Retires four user P0s and unblocks p0-daily-summary-view, the rule-based classifier path, and identity_fn DB writes. No movement today — the next-unblockable item is unchanged from this morning, and everything downstream on the critical path still waits on it.

Sprint progress Sprint 1 · 2026-06-22 → 2026-06-26 ET · Foundation hardening + AMS unblock

0 tickets done / 8 total in the current sprint · 0% complete · day 1 of 5
Goal: Close Phase 0 gaps. Seed AMS users so onboarding stops being painful. Fix Acct-v2 date-range bugs.